Modular & Portable Buildings.

   0800 644 64 64  Unit N, Ivanhoe Business Park, Ashby-de-la-Zouch LE65 2AB

Our Services

Self-Contained Welfare Facilities

The first essential on any new project. Immediate, fully-equipped welfare for your team — on site from day one, before anything else arrives.

SCROLL

Immediate Welfare Provision

Day One on Site. Ready from the Start.

We all know how it goes on the first day of a new project. The groundworks team arrives ready to begin — but welfare provisions still need to be in place before a single person can legally start work. That is where our self-contained welfare units come in.

16ft towable rear

"Welfare on site from day one — so your team can start work immediately, fully compliant."

Our Units

Towable or Static:
We Have the Right Unit for You

We offer both towable and static welfare units depending on the size of your workforce and the specific requirements of your site. Browse the options below to find the right fit.

1

Towable Welfare Units

A cost-effective and flexible option — towable units reduce transport expenses and can be easily repositioned around the site as your project develops. Ideal for smaller teams or sites with changing layouts.

2

Static Welfare Units

Designed for larger workforces and longer-duration projects, static units offer greater capacity and can be connected to mains services for a more permanent welfare solution throughout the build.

What's Included

Everything Your Team Needs from Day One.

Our self-contained welfare units are fully equipped and ready to use from the moment they arrive on site — meeting all UK welfare compliance requirements as standard.

Canteen & Rest Area

A dedicated space for your team to take breaks, eat lunch and decompress. Fitted with seating, a kettle point and table space as standard.

Toilet Facilities

Self-contained toilet provision included in every unit — keeping your site compliant with UK welfare regulations from the very first shift.

Heating & Lighting

Fully heated and lit throughout — meeting the HSE requirement for adequate heating and lighting in all welfare facilities, regardless of the season.

Drying Room

Space to dry wet workwear between shifts — a practical requirement on any UK construction site and an important welfare provision for your team’s comfort.

Office Space

A dedicated area for site managers to work, review drawings and conduct briefings — keeping your project management and welfare provision in one place.

Weekly Servicing

All units are serviced weekly as standard — with the option to increase service frequency to meet the demands of a larger workforce or more intensive site activity.

All units are serviced weekly as standard, with the option to increase frequency. Your welfare facilities are always clean, stocked and compliant.

Flexible by Design

The Right Unit for Every Stage of Your Project

A self-contained welfare unit is not a one-size-fits-all solution. The right choice depends on the size of your workforce, the duration of the project and the access constraints of your specific site.

Our towable units are a cost-effective option — reducing transport expenses and offering the flexibility to be repositioned easily around the site as your project evolves. Ideal for the early stages where access is still being established.

For larger or longer-duration projects, our static units offer greater capacity and can be connected to mains services for a fully integrated welfare solution throughout the build.

Browse our layouts and specifications to find the unit that best fits your needs — or speak to our team and we will advise you on the right solution for your specific workforce and site conditions.